Home Page | Layout Index |
|
Butch Orr - ModelerButch Orr's HO Beaver Oak Railroad is always under construction. The bulk of the trackwork was complete and scenery was underway when these photos were taken in the summer of 2004. The layout was built on two levels with two helixes connecting the levels. Since that time, a whole new layout has been designed and is in the works. Butch changes layouts like most of us change socks.
|
This album has 11 photos in total.